SHARE THIS POST




Verify Engineering installs 5000 litre oxygen tank at Chipige District Hospital


Tanaka Makuwaza |  2 months ago | top


Verify Engineering (VE) has installed a 5000 litre oxygen tank, vaporizer system and reticulation system in all wards at Chipinge District Hospital with funding from a local development partner. VE CEO Engineer Pedzisai Tapfumanei confirmed the development saying the project which is valued at more than US$170 000 and yet to be commissioned was funded by World Vision, highlighting that it will go a long way in addressing the need of oxygen at the hospital and saving lives. VE Gases runs two plants at Feruka in Mutare specialising in the production of medical and industrial gases.